Caley Court, Saltcoats Case Study

TACS provided the full communications infrastructure package for the recent refurbishment of Caley Court Sheltered Housing in Saltcoats, Ayrshire.

TACS provided the following

  • Structured Cabling (Cat5e)
  • Disabled Toilet Alarms
  • Intruder Alarm
  • Access Control
  • DDA Induction Loop System
  • CCTV System

The project was completed over a 8 week period and allowed the main contractor to have one point of contact dealing with the design and implementation of their telecoms requirements and for their ongoing maintenance requirements. The project allowed TACS to show the diverse range of products they can install.